Two proposals for the same patio can quote the same square footage, name the same paver and describe two entirely different pieces of construction. One specifies a deep compacted aggregate base and a cut border set against a restraint; the other specifies a bedding layer over graded soil and a plastic edge spiked at the perimeter. Homeowners comparing a masonry contractor in Livonia, MI usually find the gap between two prices sitting in lines like those, well below the finish they are looking at in the photographs.
Our trading name reads as lawn care, so here is the orientation a masonry search deserves: the stone, block and paver work sits inside our Design and Build division, alongside retaining and seating walls, paver patios and walkways, driveways and entrances, concrete and fire features.
Teddy’s Lawn & Landscape has served local communities since 1994 and is an 11-time MGIA Award Winner for Outstanding Achievement in Hardscapes. Masonry is the material discipline inside that work rather than a separate line of business, and it is the part of a build a homeowner has the hardest time judging from a finished photograph.
What follows is a materials guide rather than a buyer’s checklist. It covers what gets mortared and what gets set dry, how segmental block, natural stone, brick and poured concrete behave once they are in the ground, what the base under all of it has to do, and which lines in a proposal are worth setting side by side.
What Does Masonry Cover Inside a Hardscape Build?
Masonry inside a hardscape build covers two categories, unit masonry and flatwork, and they are priced and built differently. Unit masonry is the vertical work: wall units, pillars, steps, the stone face on a fire feature, anything laid as individual pieces that carry load or hold back soil. Flatwork is the horizontal surface, meaning patios, walkways, driveway fields and the poured slabs underneath them.
A proposal that folds the two into one number is compressing the more demanding half. Vertical work sets the character of a finished space and takes the most hours per square foot, because every unit is placed by hand, leveled and checked against a string line before the next course goes on.
The joint between the two categories is where quality shows. Where a wall meets a patio, where steps land on a paver field, where a pillar base sits inside flatwork, two systems with different movement behavior have to be detailed to move together. Our retaining and seating walls are dimensioned against the flatwork they meet while both are still on paper.
Which Masonry Method Belongs Where, Mortared or Dry-Laid?
Mortared masonry belongs where an element should read as one rigid object, and dry-laid masonry belongs where the ground needs room to move. Mortared work binds units with cement mortar over a rigid footing, normally poured concrete carried below the frost line, and produces one monolithic element. That suits a fire feature, an outdoor kitchen base, a stone-faced pillar or a flight of steps with cut treads, where the piece holds a fixed finish.
Dry-laid masonry sets units without mortar on a compacted aggregate base, held by their own weight, by interlock and, in a wall, by geogrid or a pin and lip system. That is the standard approach for segmental retaining walls, seating walls and paver surfaces. The advantage is movement: ground that heaves in February shifts a dry-laid assembly a fraction and lets it settle back without cracking anything.
Rigid systems ask more of what sits underneath. A mortared element over a shallow footing reports every bit of soil movement as a crack along a joint, and putting that right is a masonry repair rather than a reset. A dry-laid element over a thin base goes out of level instead, and it gets lifted, re-based and relaid.
Most projects use both methods. The patio floor, the seat wall and the steps are often dry-laid while the fireplace and the pillars are mortared over footings, and the proposal should say which element is which. If it does not, ask, because the two methods carry different excavation, different concrete and different labor hours.
How Do Block, Natural Stone, Brick and Poured Concrete Compare?
Block is the most predictable for walls, natural stone the most individual, brick the most precise and formal, and poured concrete the only one that works as a continuous plane and a structural footing. Segmental concrete block is engineered for walls. The units are dimensionally consistent, they carry an integral setback or pin system that builds the batter into the wall, and the manufacturer publishes design tables for height and geogrid spacing, while split faces weather to a softer tone across a few seasons.
Natural stone boulders and cut stone behave the opposite way. Every piece is different, so the mason is fitting rather than stacking, and the labor per linear foot climbs. What that buys is a wall with no repeating pattern and a face that reads as part of the landscape rather than a product, and boulder walls suit irregular grades that a modular system would fight.
Traditional brick sits between the two in character and above both in precision. Small units mean more joints per square foot and more hours, and the result is a formal line that suits an entrance, a pillar, a banding course or an apron at the head of a drive. Traditional brick is one of the material options for driveways and entrances, and pairing a paver field with a brick border is a common way to use it.
Poured concrete is a plane and a structure rather than a unit. It gives an uninterrupted surface with no unit joints to maintain, takes a brushed or exposed finish, and under any mortared element it is the footing the rest depends on. Our concrete work also covers concrete interlocking blocks, which sit between poured construction and a segmental system for walls.
What Does the Base Under Hardscape Masonry Have to Do?
The base under hardscape masonry has to carry the load and move water. Under flatwork that means excavating well below the finished surface, placing aggregate in lifts and compacting each lift with a plate or a roller before the next one goes down. The depth is not one number across a site: a walkway, a patio and a driveway carrying vehicles each call for a different section.
Compaction in lifts is the line most often thinned in a competitive bid. Aggregate dumped to full depth and rolled once looks identical on the day the pavers go down and behaves differently in year three, because the lower portion was not densified. A proposal that names lift thickness and compaction method is describing a different build from one that names only a total depth.
Behind a wall, the base question becomes a water question. Free-draining stone behind the units, a drain line at the bottom of that stone with somewhere to discharge, and a separation fabric between the stone and the native soil keep hydrostatic pressure off the back of the wall. A wall backfilled straight against clay is loaded by every heavy rain.
Subgrade varies across a single property in this part of Wayne County. Our crews look at what is actually under the topsoil before the section is finalized, because sand and heavy clay call for different depths, different geotextile decisions and occasionally a different system.
Why Do Caps and Edge Restraint Decide How Masonry Ages?
Caps and edge restraint decide how masonry ages because they are the parts of the assembly exposed to weather on more than one plane.
A wall cap sheds water off the top course, closes the hollow cores of the units below, and absorbs the wear of people sitting on it. Caps are set in a flexible masonry adhesive over a clean, level top course, and an overhang of an inch or so throws water clear of the face.
Cap material is a genuine decision rather than a trim detail. Manufactured concrete caps match a segmental wall and arrive in consistent lengths, while cast stone and natural stone caps cost more per linear foot, cut to any radius and give a seat wall a different top line. A curved wall is where the difference shows, because a radius either cuts cleanly or opens a widening joint at every piece.
Edge restraint applies the same principle to flatwork. A paver field without a restrained perimeter spreads outward under traffic and freeze cycles, the joints open and the border course migrates. On our paver patios and walkways, the detail that matters is a restraint spiked into the compacted base rather than into the bedding sand, which is where that detail quietly fails.
How Should Freeze and Thaw Change Masonry Detailing in Southeast Michigan?
Freeze and thaw in Southeast Michigan mean every masonry detail has to give water somewhere to go before it freezes. The region runs through dozens of freeze and thaw cycles in a season, and water held in a joint, a hollow core or a soil pocket expands each time it crosses zero.
On flatwork that means slope. A patio or walkway is pitched away from the house at a consistent fall, joints are filled with a sand that resists washout, and the base below is open enough that water travels through it instead of ponding under the pavers. A dead-level surface holds the water that later lifts it.
On vertical work it means footings and backfill. Mortared elements sit on footings taken below the frost depth, so ground freezing above them cannot lift the assembly, and dry-laid walls depend on the drainage stone behind them staying free of fines.
A proposal that states footing depth and what goes behind the wall is accounting for February.
Which Line Items Separate Two Masonry Proposals?
Six line items separate two masonry proposals, and the paver name is not one of them. The first three sit below grade: excavation depth and where the spoil goes, the base material with its lift thickness and compaction method, and the footing depth and width under any mortared element.
The fourth is the drainage stone, separation fabric and discharge behind any wall. The remaining two sit at the finish: cap material with its fixing method and overhang, and edge restraint with the layer it is anchored into. Joint treatment belongs in that last group as well, since polymeric sand, standard sand and mortar joints age differently across a decade and are priced accordingly.
Line those items up across proposals and the pricing tends to explain itself. A number that sits well under the others is generally lighter somewhere on that list, and the scope pages are where it shows rather than the rendering.
Ask each firm to mark which of the six their figure includes, and two bids that looked interchangeable separate on a single sheet of paper.
Talk Through Your Masonry Project With a Livonia, MI Team
Material decisions are more straightforward to make standing on the site than reading a line item at the kitchen table. Our designers will walk the grade with you, look at what is under the topsoil, and hold block, natural stone, brick and concrete samples up against the house and the planting that is already there.
Teddy’s Lawn & Landscape builds the masonry side of hardscape projects across Livonia, MI and the surrounding communities, and a site visit is where the material choices get settled.
Schedule your masonry design consultation with Teddy’s Lawn & Landscape before the bids arrive.
In Summary
Does a mortared wall outlast a dry-laid one in Michigan?
A mortared wall and a dry-laid wall last equally long in Michigan when each sits on the foundation it needs, because they fail in different ways. A mortared wall on a footing below the frost line and a dry-laid segmental wall on a compacted base with drainage stone behind it will each hold for decades. The mortared one cracks along a joint if its footing moves, while the dry-laid one goes out of level if the base was thin. The method therefore matters less than what was built underneath it.
What base depth should a masonry proposal in Livonia, MI specify?
A masonry proposal in Livonia, MI should specify a base depth for each area rather than one figure across the whole site. A pedestrian walkway, a patio and a driveway carrying vehicles each require a different section, and heavy clay calls for more depth than sand. Alongside the depth per area, the proposal should name the lift thickness, the compaction method and the aggregate type.
Can natural stone, segmental block and brick be combined in one project?
Natural stone, segmental block and brick combine well in one project, and Teddy’s Lawn & Landscape builds with all three. A common arrangement uses segmental block for the structural body of a wall, cast or natural stone for caps and pillar tops, brick for a border or banding course, and a large-format paver for the field. The discipline is holding the palette to two or three materials and repeating them across the property, so the result reads as one build rather than a sample board.
How do I tell if a quote includes the cap and the edge restraint?
A quote includes the cap and the edge restraint when each appears as a separately priced line with a material named, not as part of a wall or patio allowance. A cap line should state the material, the thickness and the overhang, and an edge restraint line should state the type and the layer it is anchored into. If either appears only inside a lump-sum description, ask for it to be broken out before you sign, because those two items are the ones most frequently trimmed to reach a number.
Related: Drainage Is Not Glamorous. But It Is the Foundation of Every Landscape That Lasts